Marwood Towers

Marwood Towers

We’ve summarised all the key safety information for you to make it as easy as possible for you to access and understand, but if you’d like to know about any of this in more detail, please just get in touch. You can email us to request more information.

About your building

Address: 43 Boundary Street East, Liverpool, L5 5FD
Number of storeys: 15
Height: 38 Meters
Number of Apartments: 81 Flats
Year of construction: 1964
Responsible Person: Emmanuel Oboh
Accountable Person: Steve Coffey (Torus 62 Ltd)
Evacuation Strategy: Stay Put (Defend in Place).

We carry out regular structural assessments of our buildings to assess their strength and stability. They involve experts inspecting the building’s framework, materials, and support systems to ensure everything is in good condition, helping to ensure the safety and longevity of the structure.

  • Who checks: Curtins
  • How often: Every 5 years. Last surveyed on 04 October 2023

The construction of the building is: concrete. The tower is constructed of blockwork walls with a concrete floor plate which is approximately 120mm thick. The external walls are glazed bricks at the lower levels and with cladding above. The floors are constructed of concrete with solid Internal Walls. There is a central core that contains one passenger lift and one lift that is classed as a firefighting lift.

A Fire Risk Assessment (FRA) is a report on the fire hazards within the communal areas of a building, as well as the external walls and materials used. It’s carried out by an independent fire safety expert annually, explains the key safety measures in place and identifies any potential fire safety risks.

It also gives recommendations for us to follow if more safety measures are needed to prevent, control, and reduce the effects of a fire. Our FRAs are made available to the Fire and Rescue Service whenever necessary.

  • This Fire Risk Assessment was completed by: FCMS (Darren Cookes MIFSM NEBOSH DipFD)
  • Date of latest Fire Risk Assessment: 28 April 2025
  • Next Fire Risk Assessment due: April 2026.

Building maintenance and inspections

Equipment
Contractor
Maintenance Frequency
Automatic Doors and Gates Openview 6 monthly
Access Intercom Openview
Annually
Fire Doors - Communal FCS Live 3 monthly
Fire Doors - Flats Front Doors FCS Live Annually
Heating (Air source heat pumps, gas boilers, gas driers Sure Maintenance Annually
CCTV Openview Annually
Passenger Lifts Knowsley Lift Services Monthly
Passenger Lifts LOLER's OTIS 6 monthly
Communal Fire Detection System Fieldway LTD 6 monthly
Evacuation Alert System Fieldway LTD
6 monthly
Sprinkler Suppression System Fieldway LTD
Annually
Domestic Smoke / Heat Detection HMS At void or every 5 months
Dry Riser Fieldway LTD
6 monthly
Bin Chute Fire Suppression System Fieldway LTD
6 monthly
Emergency Lighting HMS Monthly
Lightning Protection Fieldway LTD Annually
Mains Water Services HMS 6 monthly
Fire Extinguishers Fieldway LTD
Annually
Electrical Testing (Communal EICR) HMS 5 yearly
Electrical Testing (Domestic EICR) HMS 5 yearly
Portable Appliance Testing (PAT) HMS Annually
Asbestos Torus Annually


Last service and maintenance information is available on request. If you'd like to know when the equipment in your block was last inspected or serviced, please contact us on 0800 678 1894 or email us at buildingsafety@torus.co.uk.